
PHOTOS: First blade arrives for Coopers Gap wind farm
EVER wondered how the massive parts for a project as big as a wind farm are transported?
Well, now you know. Turns out it takes a huge truck and a whole lot of careful planning.
The first blade for the much-anticipated Coopers Gap wind farm made its way from Brisbane to Cooranga North overnight, arriving early this morning.
Photos show the logistical feat involved in transporting such large cargo, as the truck carrying the blade made its way up the windy and narrow range.